To resequence steps:

  1. Go to Sign Requests or Templates as applicable.
  2. Search for and select the sign request or template you want to edit.
  3. Click the form icon (third from the left) in the header. If you see a document icon instead, then you’re already in the form/checklist editor view and can go to the next step.
  4. Use the drag and drop icons appearing to the left of each step to drag and drop steps into the desired sequence.